Water Utility IntelligenceBerliner Wasserbetriebe

Free Utility Snapshot

Berliner Wasserbetriebe

Berlin, Germany

Public water, wastewater and stormwater utility serving Germany’s capital and the surrounding metropolitan system.

Water, wastewater & stormwater · Public-law institution · Latest evidence 2025

At a glance

Scale, service and financial position

3.8mDrinking-water population served2025 company description
217m m³Annual water sales2025
7,892 kmDrinking-water network2025
257m m³Wastewater treated2025
9,788 kmTotal sewer network2025
€1.343bnCompany revenue2025

01

About the Utility

Berliner Wasserbetriebe is Berlin’s publicly owned water and wastewater operator. Established as a public-law institution, it is wholly owned by the State of Berlin and works under the city’s statutory and political oversight. The utility supplies drinking water, collects and treats wastewater, manages parts of the stormwater system and, through related activity, contributes to renewable-energy and urban climate-resilience programmes. Its operating territory is the Berlin metropolitan area, with drinking-water service for 3.8 million people and wastewater treatment for 4.7 million people, including surrounding communities. Nine waterworks and six operated wastewater treatment facilities anchor a large urban infrastructure estate. The utility’s role is expanding from network operator toward a broader critical-infrastructure partner as Berlin plans for drought, heavier rainfall, ageing assets and long-term changes to regional water availability.

02

Water System

Berlin’s drinking water is drawn entirely from regional groundwater, with bank filtration forming an important part of the supply system. Water is treated at nine waterworks; the reported combined production capacity is 1.1 million cubic metres per day, while annual water sales were 217 million cubic metres in 2025. The drinking-water network extends 7,892 kilometres and includes 283,000 building connections. Source security is increasingly central to planning. Groundwater levels have been under drought pressure, and the planned phase-out of lignite mining in Lusatia creates a longer-term risk to dry-season flows in the River Spree. Berliner Wasserbetriebe is responding through network renewal, reactivation of waterworks, deeper wells, demand measures and closer monitoring of groundwater through more than 2,500 observation pipes.

1.1m m³/dayWaterworks production capacity2025
283,000Building connections2025
9Waterworks2025

03

Wastewater System

The wastewater system combines a 9,788-kilometre sewer network with six operated treatment facilities. Berliner Wasserbetriebe reported treating 257 million cubic metres of wastewater in 2025. The network includes 1,928 kilometres of combined sewers, as well as dedicated foul-water and rainwater systems; these distinctions matter because combined-sewer pressure during intense rainfall is a separate problem from treatment throughput. Investment is adding storage, advanced treatment and sludge-processing capacity. At Schönerlinde, an ozonation-based fourth treatment stage and flocculation filtration strengthen trace-substance removal. The utility is also moving from conventional rainwater conveyance toward local retention through Berlin’s sponge-city work, the Berlin Rainwater Agency and cross-city blue-green infrastructure partnerships.

1,928 kmCombined sewer network2025
6Wastewater treatment facilities operated

04

Investment & Priorities

Berliner Wasserbetriebe invested €589.0 million in fixed assets excluding financial assets in 2025, up from €574.0 million in the prior year. Of the 2025 total, €543.7 million was self-financed. The programme is directed toward network rehabilitation, expanded treatment, sludge utilisation, supply resilience and climate adaptation. Treatment works received €184.9 million during the year, including €92.7 million for the Waßmannsdorf sludge-utilisation plant and the Ruhleben site extension. These are annual fixed-asset investments and should not be confused with the broader multi-year programme values cited for individual facilities or Berlin-wide infrastructure commitments.

€589.0mInvestment in fixed assets excluding financial assets2025
€543.7mSelf-financed investment2025
€184.9mInvestment in treatment works2025

Fixed-asset investment

Reported actuals and company plan, 2024–2027

€ million
Fixed-asset investment: 2024, 574 € million, actual; 2025, 589 € million, actual; 2026, 600.8 € million, plan; 2027, 691.3 € million, plan020040060080057420245892025600.82026691.32027
ActualCompany plan

Investment in fixed assets excluding financial assets. The 2024 and 2025 values are reported actuals; 2026 and 2027 are company plan values and are visually distinguished.

Sources: Berliner Wasserbetriebe, Geschäftsbericht 2025, performance indicator table.

05

Sustainability & Resilience

Berliner Wasserbetriebe links operational decarbonisation with energy recovery, resource circularity and city-scale climate adaptation. Its six wastewater treatment facilities generate 70% of the energy they require through combined heat and power using biogas from sludge digestion, sludge incineration with heat recovery and on-site wind generation. Schönerlinde reports 87% energy self-sufficiency from microturbines and wind turbines. The wider programme includes renewable generation through Berliner Stadtwerke, new sludge-utilisation capacity and phosphorus recovery ahead of Germany’s 2029 requirement. Berlin’s Rainwater Agency and Blue-Green Alliance extend resilience work beyond conventional drainage by promoting local retention, infiltration and evaporation across the city.

70%Treatment-site energy generated internallyAcross six wastewater treatment facilities
87%Schönerlinde energy self-sufficiencySchönerlinde treatment facility
50%Reported reduction in CO₂ emissionsSince 1990

06

Key Challenges

  1. Sustaining water availability as groundwater levels and dry-season River Spree flows come under pressure.
  2. Renewing a large, ageing water and sewer network while coordinating works across a dense city.
  3. Reducing combined-sewer overflows and adapting stormwater systems to heavier rainfall.
  4. Adding advanced wastewater treatment and phosphorus recovery while managing energy demand.

07

Major Projects

Schönerlinde advanced treatment

Adds ozonation-based fourth-stage treatment, filtration and storage to improve trace-substance removal and system resilience.

Status / period
Ozonation completed; filtration was scheduled through mid-2025
Investment / capacity
Around €200m programme to 2025

Waßmannsdorf sludge-utilisation plant

Builds in-house capacity for sludge and screenings, supporting energy recovery and the move toward mandatory phosphorus recovery.

Status / period
Under construction at the evidence date
Investment / capacity
68,000 tonnes/year design quantity · around €260m

Landsberger Allee network renewal

Renews major water and wastewater lines beneath a key east-Berlin transport corridor as part of the wider network rehabilitation programme.

Status / period
Listed in 2025 investment reporting

Evidence

Sources and reporting periods

This profile is derived from Our Future Water’s governed documentary estate for Berliner Wasserbetriebe, including annual reporting, official operating indicators, Berlin Senate material and utility project documentation.

Evidence through: 2026-09-2172 source documents

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.