Intelligence Reports/Insight Brief
Water Infrastructure Investment and Project Pipeline in Jeddah cover

Insight Brief

Water Infrastructure Investment and Project Pipeline in Jeddah

A guide to water infrastructure investment in Jeddah: the programmes and projects planned or under way, who is responsible, the risks to delivery and what to watch. Most of Jeddah's water work still being contracted is in sewers and storm drains: NWC's two 2025 packages carry over SAR 2.3 billion (wastewater) and over SAR 1.8 billion (water) of announced cost, and SR 536.3 million of north Jeddah sewer contracts were awarded in February 2026. The municipality's KAFA tunnel, at about USD 175 million per phase, still had no signed agreement in August 2026, while Prince Fawaz drainage bids close on 15 November 2026.

Geography
Saudi Arabia
Evidence current to
13 November 2026
Format
PDF
Length
13 pages
Edition
November 2026, First edition
Price
USD 249
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

Over SAR 2.3 billion and over SAR 1.8 billion: announced costs of NWC's two Jeddah packages, 15 wastewater projects (May 2025) and 22 water projects (August 2025)

SR 536.3 million (USD 143 million): two north Jeddah sewer contracts awarded by NWC to Civil Works Company in February 2026

About USD 700 million: Shoaiba 6 desalination plant, a Saudi Water Authority EPC contract, under construction since 29 October 2025

About USD 175 million per phase: KAFA stormwater tunnel phases 1–2, contractor selected in 2025, agreement unsigned as of August 2026

02

Buyer relevance

Who the report is for

Civil and tunnelling contractors

Time bids for the Prince Fawaz and Old Zahraa drainage packages and track the unsigned KAFA tunnel agreement.

Pumping, pipe and treatment equipment suppliers

Size opportunities around the 611,000 m³/day airport lift station and more than 238 km of surface-water lowering networks.

PPP investors and lenders

Compare SWPC plants serving the region, from Jeddah Airport 2 (SAR 846 million) to Rabigh 4 and the planned Rabigh 5, and their financing.

Engineering and programme consultants

Map which of NWC, SWPC, SWA and Jeddah Municipality buys each type of work, with stage and timeline for every named project.

03

Decision scope

Questions answered

01

How much is NWC investing in Jeddah?

Two separately announced packages: over SAR 2.3 billion for 15 wastewater projects (May 2025) and over SAR 1.8 billion for 22 water projects (August 2025), announced costs rather than spending.

02

When is the Eastern Tunnel due?

The 14 km sewer was 60% complete in January 2026, its northern drive broke through after 6.88 km in July 2026, and handover was due by end-2026 as of January.

03

Has the KAFA stormwater tunnel been contracted?

Thrustboring Construction Company was selected in 2025 for phases 1–2, about USD 175 million per phase, but no agreement had been signed as of August 2026.

04

Which desalination plant is being built near Jeddah?

Shoaiba 6, about 500,000 m³/day and about USD 700 million, a Saudi Water Authority EPC contract under construction since 29 October 2025.

04

Inside the report

Inside the complete report

Executive Snapshot

1. Why This Matters Now in Jeddah

2. Current Position

3. Key Programmes, Projects and Investment

4. Policy, Regulation and Institutions

5. Risks and Constraints

6. Strategic Implications

7. What to Watch

Source Register

05

Public preview

What to watch next

Financing evidence

Eastern Tunnel handover; the Old Zahraa award; any new SWPC wastewater procurement naming Jeddah in the Seven-Year Statement's later editions.

1. Why This Matters Now in Jeddah

The Prince Fawaz award and its value; a signed KAFA agreement.

4. Policy, Regulation and Institutions

SWA's next cost-recovery figure after the 2027 rates; any announcement on the Western Cluster concession.

2. Current Position

Site handover for the north Jeddah sewer contracts; the next SWPC procurement on the RJM corridor (Rabigh 5).

Sample page · page 6 of 13

Bulk supply PPP and EPC projects and Jeddah Municipality stormwater contracts, with owner, capacity, value and stage.

Report page showing two tables: desalination, treatment and storage projects serving Jeddah, and Jeddah Municipality stormwater projects with values and stages as of 13 November 2026.

06

Included

What you receive

The complete PDF report: 13 pages, 9 sections, 10 tables and a register of 31 sources.

This edition

November 2026, First edition.

07

Evidence & method

Evidence and method

The report draws on National Water Company announcements via the Saudi Press Agency, Saudi Water Partnership Company portfolio and project pages, Saudi Water Authority publications, and contract and tender reporting from MEED, Al-Eqtisadiah, Argaam, Zawya and Tunnels & Tunnelling, with every project stage re-checked on 13 November 2026.

Sources

31 sources, listed in the report's source register. Evidence current to 13 November 2026. Principal data periods: project, procurement and contract status as of 13 November 2026; NWC package announcements of May and August 2025 and progress reported in January and July 2026; SWPC portfolio as read on 13 November 2026; national finance figures for 2024–2026. Currency is Saudi riyals (SAR) unless stated; US dollar and euro values are given as published..

Evidence boundaries

This report uses authoritative source material available at the stated research cutoff. It distinguishes published facts, calculated values and analytical interpretation. No independent modelling is performed. Forward-looking analysis reflects published plans, documented trends and stated uncertainties. It does not constitute legal, financial, investment or engineering advice.

08

Lead analyst

Robert C. Brears

Founder, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.

  • Decision-focused utility intelligence
  • Published water-policy author
  • Evidence-grounded system analysis

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

Water Infrastructure Investment and Project Pipeline in Jeddah

Format
PDF
Length
13 pages
Edition
November 2026, First edition
Price
USD 249
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
Insight Brief
Edition
November 2026, First edition
Format
PDF
Length
13 pages
Reference
OFW_EXT_WATER_INFRASTRUCTURE_INVESTMENT_AND_PROJECT_PIPELINE_IN_JEDDAH_4b40c32e1f29
Evidence current to
13 November 2026

14

Explore this report family

More Water Infrastructure Investment and Project Pipeline briefs

Explore the same report family covering other cities.

Water Infrastructure Investment and Project Pipeline in Muscat cover

Water Infrastructure Investment and Project Pipeline in Muscat

An assessment of what is being built and financed for Muscat's water, wastewater and flood protection, by whom, at what stage and value, and which contracts open to bidders by 2027. Muscat's water projects are moving fastest where private capital carries the risk: Ghubrah III, backed by a US$370 million project finance package, was 93% built in November 2026, and bids for the Al Ansab and Al Amerat sewage plant PPP are due on 5 January 2027. Network works of about RO 188 million in Al Seeb and Bawshar rest on Nama Water Services, whose 2024 operating revenue was 40.5% government subsidy, while its RO 11.1 billion master plan puts RO 7.2 billion into wastewater.
Geography
Oman
Edition
November 2026, First edition
Length
14 pages
Explore report
Water Infrastructure Investment and Project Pipeline in Doha cover

Water Infrastructure Investment and Project Pipeline in Doha

A guide to water infrastructure investment in Doha: the programmes and projects planned or under way, who is responsible, the risks to delivery and what to watch. Doha's water investment runs on two tracks: Facility E, a QAR 13.5bn power and desalination plant financed with a USD 2.97bn co-financing package and due to deliver full water on 1 August 2028, and a flow of Ashghal drainage work led by eight projects worth about QAR 7bn scheduled for tender since February 2026. Delivery risk is visible, with eight delayed Ashghal packages re-awarded to new contractors in October 2026.
Geography
Qatar
Edition
November 2026, First edition
Length
13 pages
Explore report
Water Infrastructure Investment and Project Pipeline in Abu Dhabi cover

Water Infrastructure Investment and Project Pipeline in Abu Dhabi

Abu Dhabi's water network and wastewater projects are moving through award and procurement, with a US$163 million STEP pumping-station rehabilitation, a 1 million m³ emergency lagoon and the US$775 million Mirfa–Liwa scheme due for bids on 5 January 2027, while the next desalination purchase agreement is unclear: Saadiyat has a letter of award to Acciona but a contested status, with 2025 reports of possible cancellation and MEED still naming Acciona as developer in April 2026. Network investment under RC2 was projected at AED 16.2 billion against about AED 21.3 billion forecast by the companies, and the successor control from 1 January 2027 had not been issued as of 11 November 2026.
Geography
United Arab Emirates
Edition
November 2026, First edition
Length
12 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.