Free City Snapshot

Jeddah

Saudi Arabia

A Red Sea city with no perennial surface water, supplied with desalinated seawater through a regional transmission system, and now extending its sewers, wastewater treatment and flood drainage.

Browse all 4 city reports

Paste the caption with your link. Social platforms control how previews appear.

At a glance

Scale, resources and strategic position

3.71 millionPopulation
~650 kmRabigh–Jeddah–Makkah transmission pipeline
665,000 m³/dayShuaiba-5 desalination output
300,000 m³/dayJeddah Airport 2 wastewater treatment capacity
SAR 2.3 billion+Wastewater development projects
SAR 1.8 billion+Water and network capital projects

01

City Water System

Jeddah, a Red Sea port and the main air gateway for pilgrims travelling to Makkah, had 3.71 million residents in the city proper at the 2022 census. It has no perennial surface water and depends on desalinated seawater. The Saudi Water Authority, formed in 2024 from the Saline Water Conversion Corporation, regulates the sector and produces desalinated water. The Water Transmission and Technologies Company carries it in bulk, and Sharakat procures privately financed plants. The National Water Company, owned by the Public Investment Fund, distributes water and handles wastewater through its Western Cluster, operated by a private consortium under a contract signed in 2022. Jeddah Municipality manages stormwater drainage.

02

Resources & Supply

Jeddah’s supply is desalinated Red Sea water from coastal plants in the city and at Shuaibah to the south. It reaches consumers through the Rabigh–Jeddah–Makkah transmission system, about 650 km of pipeline that also serves the rest of Makkah Region. The Saudi Water Authority reported Shuaiba-5 output of 665,000 m³ a day in February 2026, 11% above design, and the 600,000 m³-a-day Shuaibah 3 plant, converted to reverse osmosis, entered operation in 2025. Neither source states Jeddah’s share.

Demand peaks in the Hajj season, when the regional system was ready to supply up to 1.3 million m³ a day in 2024. In 2017 more than 20% of water was lost to leakage in the city’s distribution network.

1.3 million m³/dayBulk supply readiness, Hajj season
600,000 m³/dayShuaibah 3 Conversion reverse-osmosis plant
>20%Leakage in the distribution network

03

Wastewater & Stormwater

Wastewater services have lagged supply. A 2021 King Saud University study found that 50% of Jeddah’s wastewater was treated, against 60% in Riyadh and 78% in Dammam. Since 2023 the privately financed Jeddah Airport 2 plant has added 300,000 m³ a day of treatment capacity. In May 2025 the National Water Company launched 15 wastewater projects worth more than SAR 2.3 billion, including a 14 km sewer tunnel.

Flooding is a separate risk: a record 179 mm of rain fell on 24 November 2022. By end-2024 the municipality’s stormwater projects completed or under way covered 46% of the city, with full coverage targeted for 2033, according to consultant WSP.

50%Wastewater treated
611,000 m³/dayAirport sewage lifting station capacity
179 mmRecord rainfall event

04

Investment & Resilience

Recent investment is concentrated in the city’s networks. The National Water Company began 22 projects worth more than SAR 1.8 billion in August 2025, covering about 984 km of pipelines and networks. In April 2025 it completed more than 320 km of drinking-water networks for three districts, and two projects worth over SAR 620 million are lowering surface water levels.

The system’s exposure is structural. Supply depends on a few coastal production sites and one main transmission corridor, and desalination accounted for 17.19% of Saudi Arabia’s CO₂ emissions in 2016. The Kingdom’s Fourth National Communication names Jeddah among three Red Sea cities most vulnerable to sea-level rise.

05

Key Challenges

  1. Securing a supply that depends wholly on desalination, a few coastal plants and one main transmission corridor.
  2. Reducing distribution losses, which exceeded 20% in 2017, the latest Jeddah figure available.
  3. Extending wastewater collection and treatment, with only half the city’s wastewater treated in 2021.
  4. Protecting districts from flash floods while stormwater drainage remains incomplete.
  5. Managing seasonal demand peaks during the Hajj and Umrah seasons.

Evidence

Drawn from Saudi Water Authority, Sharakat and Saudi Press Agency releases, including National Water Company announcements, UN census data, the Fourth National Communication, studies and trade press, in Arabic and English. Some city figures date from 2017–2021.

Evidence through October 2026 · 110 sources read

Report library

City reports on Jeddah

4 reports available for purchase

Climate Resilience: Drought and Flood Risk in Jeddah cover

Climate Resilience: Drought and Flood Risk in Jeddah

An assessment of how exposed the water system in Jeddah is to drought and flooding, and how far current programmes, policy and investment reduce that risk. The climate risk documented for Jeddah's water is flooding: 179 mm fell on 24 November 2022, more than the 86.4 mm recorded at Jeddah-KAIA in all of 2018. The city's stormwater programme covered 46% of the city at end-2024 against a 75% target for 2028. Its largest scheme, the KAFA tunnel at about USD 175 million per phase, had no signed agreement as of August 2026.
Edition
November 2026, First edition
Price
USD 249
Explore report →
Water Security and Supply Outlook in Jeddah cover

Water Security and Supply Outlook in Jeddah

An assessment of whether water supply in Jeddah can keep pace with demand, and which sources, projects and policies will decide that. The desalination system that supplies Jeddah has grown since 2024: Shuaiba-5 now produces 665,000 m³/day against a 600,000 m³/day design, Shuaibah 3 Conversion has operated since May 2025 and Rabigh 4 is reported online. These are regional capacities serving Jeddah, Makkah and other towns of the Makkah Region. The city's latest indicators are leakage above 20% (2017) and an academic projection of demand rising from 335 MCM in 2017 to 779 MCM in 2030.
Edition
November 2026, First edition
Price
USD 249
Explore report →
Water Infrastructure Investment and Project Pipeline in Jeddah cover

Water Infrastructure Investment and Project Pipeline in Jeddah

A guide to water infrastructure investment in Jeddah: the programmes and projects planned or under way, who is responsible, the risks to delivery and what to watch. Most of Jeddah's water work still being contracted is in sewers and storm drains: NWC's two 2025 packages carry over SAR 2.3 billion (wastewater) and over SAR 1.8 billion (water) of announced cost, and SR 536.3 million of north Jeddah sewer contracts were awarded in February 2026. The municipality's KAFA tunnel, at about USD 175 million per phase, still had no signed agreement in August 2026, while Prince Fawaz drainage bids close on 15 November 2026.
Edition
November 2026, First edition
Price
USD 249
Explore report →
Jeddah City Intelligence Profile cover

City profile

Jeddah City Intelligence Profile

A reference profile of the water system in Jeddah: its sources and supply, the institutions that run it, major projects, tariffs and finance, climate risk and what to watch next. Jeddah's bulk supply has grown at regional scale, with Shuaiba-5 raised to 665,000 m³/day and Shuaibah 3 Conversion operating since May 2025; these plants serve the wider Makkah Region. The city's own weak points are local: leakage above 20% (2017) and stormwater projects covering 46% of the city at end-2024. The capital now moving is local too: NWC packages of over SAR 2.3 billion (wastewater) and over SAR 1.8 billion (water), and municipal drainage contracts.
Edition
November 2026, First edition
Price
USD 99
Explore report →

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.