Intelligence Reports/Water Utility Intelligence Report
Water Utility of the Future: Johannesburg Water cover

Water Utility Intelligence Report

Water Utility of the Future: Johannesburg Water

An assessment of how Johannesburg Water is changing from a City-run service into a ring-fenced operator of its network, and which commitments must be delivered between 2026 and 2033. Johannesburg Water has kept its own water and sanitation revenue since July 1, 2026 and budgets R13.06 billion of capital over five years, rising to R4.384 billion in 2030/31, against R1.312 billion spent in FY2024/25. Its Circular 88 targets take non-revenue water from 44.8% to 29.54% by 2029/30, while the City must cut consumption from 1,801 Ml/d to the 1,550 Ml/d its bulk licence allows.

Geography
City of Johannesburg, Gauteng, South Africa
Evidence current to
23 November 2026
Format
PDF
Length
14 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

Paste the caption with your link. Social platforms control how previews appear.

01

Executive overview

Key findings

R13.06 billion: five-year capital budget for 2026/27–2030/31, from R1.96 billion in 2026/27 to R4.384 billion in 2030/31 (budgeted, Business Plan 2026/27)

44.79% → 29.54%: non-revenue water in FY2024/25 (actual) and the Circular 88 target for 2029/30 (target); the half-year figure for H1 2025/26 was 48.7%

1,801 → 1,550 Ml/d: City consumption in June 2024 (actual) and the reduction required under Rand Water's abstraction licence (target)

140 Ml: new reservoir capacity in a program of 44 reservoirs and towers, with five new towers (program, Executive Mayor, July 2026)

02

Buyer relevance

Who the report is for

Pipe, reservoir and pump-station contractors

Follow a capital budget that rises from R1.96 billion in 2026/27 to R4.384 billion in 2030/31, the 44-reservoir storage program and the late-payment delays on Hursthill 2 and Craigavon.

Leak detection, metering and pressure-management firms

Track the performance-based contract for five district metered areas carrying 22% of system input and the 479 of 714 pressure-reducing valves already rehabilitated.

Development finance institutions and lenders

Weigh the ZAR 750 million IFC proposal on 'Hold', the R13 billion sought for pipe replacement and a collection rate of 74.84% in FY2024/25.

Wastewater treatment and compliance advisers

Set a Green Drop average of 49% and effluent compliance of 70.9% against the City's 85% target for December 2026 and a bulk wastewater budget rising to R1.7 billion.

03

Decision scope

Questions answered

01

What changed for Johannesburg Water in July 2026?

Cash sweeping to the City stopped on June 30, 2026, and single-point accountability for water and sanitation took effect on July 1, 2026 under National Treasury's Metro Trading Services Reform.

02

How large is the capital plan, and is it being spent?

R13.06 billion over 2026/27 to 2030/31; the utility spent 101.64% of its FY2024/25 budget but only 18% of the R1.704 billion 2025/26 budget by December 31, 2025.

03

How far must demand fall?

From 1,801 Ml/d in June 2024 to the 1,550 Ml/d required under Rand Water's licence; Level 2 restrictions from November 21, 2026 aim to cut consumption by 200 million litres a day.

04

When does new bulk water arrive?

The Lesotho Highlands Water Project Phase II was 56.7% complete in September 2026, with impoundment from July 2027 and extra water expected about 2028.

04

Inside the report

Inside the complete report

Executive Snapshot

1. From Service Provider to System Operator

2. System Intelligence and Digital Control

3. Energy, Carbon, and Resource Decoupling

4. Infrastructure Strategy for a Non-Stationary Climate

5. Customers, Demand, and the Water Prosumer

6. Governance, Regulation, and Institutional Reform

7. Capital Planning and Financial Architecture

8. Workforce, Capability, and Organisational Change

9. Strategic System Roadmap

Conclusion

Source Register

05

Public preview

What to watch next

7. Capital Planning and Financial Architecture

The FY2025/26 capital outturn against the R1.704 billion budget; IFC status changing from "Hold"; signature of the pipe-replacement financing; the 2027/28 business plan's restated five-year total.

4. Infrastructure Strategy for a Non-Stationary Climate

Confirmation of Crosby and the B-line in December 2026; Hursthill 2 restarting; award of the 15-reservoir repair package; a completion date for Northern Works Unit 5 Module 2; Polihali impoundment in July 2027.

6. Governance, Regulation, and Institutional Reform

The effluent result for December 2026 against the 85% target; the next Green Drop audit; the outcome of the DWS proceedings; conditions attached to the first tranche of the reform grant.

2. System Intelligence and Digital Control

Award of the five-district contract and the name of the contractor; extension of district metering beyond the first 22% of input; billing on actual readings reaching the 92% target.

Sample page · page 6 of 14

Section 4: Johannesburg Water's storage, bulk supply and wastewater projects, with status checked on November 23, 2026 and the next milestone for each.

Report page with a table listing reservoir, tower, bulk supply and wastewater works projects in Johannesburg, their scope, latest status and next milestone.

06

Included

What you receive

The complete PDF report: 14 pages, 12 sections, 9 tables and a register of 29 sources.

This edition

November 2026, First edition.

07

Evidence & method

Evidence and method

Johannesburg Water's integrated annual reports to FY2024/25, its business plans to 2026/27 and its 2025/26 mid-year report. Project, funding, tariff, legal and supply status comes from City of Johannesburg statements, parliamentary replies, the IFC disclosure and press reports checked on November 23, 2026.

Sources

29 sources, listed in the report's source register. Evidence current to 23 November 2026. Principal data periods: FY2024/25 Integrated Annual Report (year ended June 30, 2025); mid-year report for H1 FY2025/26 (to December 31, 2025); Business Plan 2026/27; project, tariff, legal and supply status checked on November 23, 2026. Currency is South African rand (R); "R…k" is rand thousand, as printed by the utility.

Evidence boundaries

This report uses authoritative source material available at the stated research cutoff. It distinguishes published facts, calculated values and analytical interpretation. No independent modelling is performed. Forward-looking analysis reflects published plans, documented trends and stated uncertainties. It does not constitute legal, financial, investment or engineering advice.

08

Lead analyst

Robert C. Brears

Founder, Our Future Water Intelligence

Robert C. Brears is a water-security specialist and author whose work examines utility governance, infrastructure investment, climate resilience and long-term water-system change for executive and policy audiences.

  • Decision-focused utility intelligence
  • Published water-policy author
  • Evidence-grounded system analysis

09

Buyer FAQs

Before you purchase

Who can use the report?

Licensed for internal use within one purchasing organization. The PDF and its contents may be shared with colleagues within that organization. External redistribution, resale and public publication are prohibited without permission.

How is the report delivered?

The PDF is available to download immediately after confirmed payment, through our secure delivery system.

Can my organization buy wider access?

Institutional purchasing: For invoice enquiries, multi-organization licensing or broader access requirements, contact Our Future Water Intelligence.

10

Water Utility of the Future: Johannesburg Water

Format
PDF
Length
14 pages
Edition
November 2026, First edition
Price
USD 499
Secure Stripe checkout · your paid edition is delivered privately in this browser.

11

Report details

Publication details

Publisher
Our Future Water Intelligence
Report family
Water Utility Intelligence Report
Edition
November 2026, First edition
Format
PDF
Length
14 pages
Reference
OFW_EXT_WATER_UTILITY_OF_THE_FUTURE_JOHANNESBURG_WATER_06acdc121fde
Evidence current to
23 November 2026

14

Explore this report family

More Water Utility of the Future reports

Explore the same report family covering other utilities.

Water Utility of the Future: National Water Company cover

Water Utility of the Future

Water Utility of the Future: National Water Company

An assessment of how National Water Company is changing from running Saudi Arabia's water and sewer networks itself to managing private operators, concessions and published service targets. National Water Company is placing a 6.6 million m³/day sewage treatment program on 15-year operating contracts and preparing distribution concessions, while non-revenue water stood at 35% in February 2026 against a 27% target. It reported 3.25 million tCO2e of emissions for 2025 and reused 26.33% of treated wastewater in 2024, but its seven service targets and its carbon plan carry no target year.
Geography
Saudi Arabia, Middle East
Edition
November 2026, New edition
Length
12 pages
Explore report
Water Utility of the Future: Acea cover

Water Utility of the Future: Acea

An assessment of how Acea is turning Rome's water service into a measured, financed system operation, and whether its Peschiera aqueduct, network program and 2028 targets can be delivered within its concession. Acea is rebuilding the trunk of Rome's water supply and digitizing the network around it, but the award of its €1.449 billion Peschiera aqueduct doubling was annulled by the Rome administrative court (reported 19 November 2026). With 783 measurement districts in place and a 2028 loss target of 41.61%, the program is financed to 2030, while the ATO 2 concession ends on 31 December 2032, before the aqueduct's planned commissioning from April 2034.
Geography
Rome and ATO 2 Lazio Centrale, Italy
Edition
November 2026, First edition
Length
14 pages
Explore report
Water Utility of the Future: Dubai Electricity and Water Authority cover

Water Utility of the Future

Water Utility of the Future: Dubai Electricity and Water Authority

An assessment of how Dubai Electricity and Water Authority is moving from thermal desalination and conventional generation to a reverse osmosis, solar, storage and smart-grid system, and what must happen by 2030. DEWA plans 735 MIGD of desalination by 2030, with reverse osmosis rising from 68 MIGD at the end of 2025 to 308 MIGD on renewable energy, and installed capacity already reached 615 MIGD at September 30, 2026. Clean power supplied 16.23% of generation in 2025, while borrowings rose to AED 43,725,005 thousand at March 31, 2026, a quarter that included a new AED 5,000 million term loan and the Empower purchase.
Geography
Dubai, United Arab Emirates
Edition
November 2026, New edition
Length
16 pages
Explore report

Stay informed

Our Future Water Intelligence updates

New analysis, water intelligence and report releases, delivered by email.