San Francisco Public Utilities Commission: Utility Account Brief cover

San Francisco Public Utilities Commission: Utility Account Brief

A supplier's guide to the San Francisco Public Utilities Commission: how it is organised and makes decisions, its financial position and priorities, how it buys, and the opportunities to target first. SFPUC is buying against a US$12,559.0 million capital plan in which Wastewater takes US$5,916.1 million and Hetch Hetchy Power capital rises 81.6%. Its largest construction package out for bid in October 2026, the Folsom Harrison/Treat box sewers, is estimated at US$200 million to US$240 million after an earlier round drew a single bid.
Geography
San Francisco, California, United States; regional wholesale supply in Alameda, Santa Clara and San Mateo counties
Edition
November 2026, First edition
Length
11 pages
Explore report
Water Systems Overview: HOFOR cover

Water Systems Overview: HOFOR

HOFOR's water service performs well, with 99.5% of water samples compliant and water loss of 6.48% in 2025, but its supply buffer was 11% against the 20–30% it describes as desired. With 5 of 8 new waterworks running and the programme due to finish in 2032, the cost of the rebuild shows in Copenhagen's 2026 price, which HOFOR gives as DKK 49.57 per m3 and the municipal tariff annex as DKK 54.93.
Geography
Greater Copenhagen, Denmark
Edition
November 2026, First edition
Length
13 pages
Explore report
HOFOR: Utility Account Brief cover

HOFOR: Utility Account Brief

HOFOR invested DKK 3,411 million across its businesses in FY2025 and expects that level to continue, but much of its near-term work is already with consortia: three are negotiating the DKK 1.9 billion Svanemøllen tunnel contract. The open entry points for suppliers are the remaining waterworks (Islev out to tender, Gørløse in design), the Thorsbro PFAS add-on, the Spangen basins and a heat-pump programme targeting 300 MW by 2035.
Geography
Greater Copenhagen, Denmark
Edition
November 2026, First edition
Length
11 pages
Explore report
Portland Water Bureau: Utility Account Brief cover

Portland Water Bureau: Utility Account Brief

Portland Water Bureau's spending is led by Bull Run Filtration, 43% complete with $1,028.34 million spent of a $2.46 billion budget at end-September 2026, and its two construction contracts, worth $1,290,000,000 and $382,000,000, are already held by construction manager/general contractor teams. The next openings sit in smart metering, energy, leak reduction and conduit work, with City purchasing on SAP Ariba since March 2026 and formal solicitations above $250,000.
Geography
Portland and surrounding areas, Oregon, United States
Edition
November 2026, First edition
Length
10 pages
Explore report
Utility Intelligence Profile: Portland Water Bureau cover

Utility Intelligence Profile: Portland Water Bureau

Portland Water Bureau is a City of Portland bureau whose Bull Run Filtration project, budgeted at $2.46 billion, was 43% complete at end-September 2026 and must deliver filtered water by September 30, 2029. First-lien debt service coverage was 7.07 times in FY 2024-25, and the typical residential water bill rose 8.1% to $70.89 in FY 2026-27.
Geography
Portland and surrounding areas, Oregon, United States
Edition
November 2026, First edition
Length
11 pages
Explore report
Water Systems Overview: Portland Water Bureau cover

Water Systems Overview: Portland Water Bureau

Portland's water system depends on one primary source: the Bull Run supplied 98% of the city's water in FY 2014-15 and 86% in FY 2015-16, and the Columbia South Shore Well Field, at close to 100 million gallons a day, cannot meet demand without it. The system's institutions are organized around filtering that supply by September 30, 2029, and the $2.46 billion filtration project was 43% complete at end-September 2026.
Geography
Portland and surrounding areas, Oregon, United States
Edition
November 2026, First edition
Length
11 pages
Explore report
Water Utility of the Future: Portland Water Bureau cover

Water Utility of the Future: Portland Water Bureau

Portland Water Bureau's transition is set by three dated programs: Bull Run Filtration, 43% complete with $1,028.34 million spent of a $2.46 billion budget at end-September 2026 and due to deliver filtered water by September 30, 2029; a smart meter program replacing about 114,000 meters, with digital reading from mid-2027; and a Net Zero Strategy to halve emissions by 2030. A single Director of Public Utilities now leads both the Water Bureau and the Bureau of Environmental Services.
Geography
Portland and surrounding areas, Oregon, United States
Edition
November 2026, First edition
Length
14 pages
Explore report
Dŵr Cymru Welsh Water: Utility Account Brief cover

Dŵr Cymru Welsh Water: Utility Account Brief

Dŵr Cymru Welsh Water has a £6.0 billion 2025-30 expenditure allowance, but Ofwat says it has not shown it is on track: water outputs were 23% below baseline in 2025-26 and, while wastewater outputs were 59% ahead, the company underspent its wastewater price control deliverable allowances by 66% and expects less than 40% of wastewater schemes to be with the supply chain by the end of 2026-27. Much of its capital and network work runs through AMP8 frameworks already let, including a £160 million consultancy framework, while the £600 million Cwm Taf scheme is due to start procurement in early 2027.
Geography
Wales
Edition
November 2026, First edition
Length
11 pages
Explore report
Utility Intelligence Profile: Dŵr Cymru Welsh Water cover

Utility Intelligence Profile: Dŵr Cymru Welsh Water

Dŵr Cymru Welsh Water's revenue reached £1,169.8 million in FY2025-26 and its regulatory capital value £8,345.0 million, yet Ofwat rated it off track after it met 6 of 23 performance targets in 2025-26. Leakage of 156.4 litres per property a day, against an industry average of 104.5, and liquidity that fell to £974 million frame the company's position at the start of the 2025-30 price control.
Geography
Wales
Edition
November 2026, First edition
Length
12 pages
Explore report
Water Systems Overview: Dŵr Cymru Welsh Water cover

Water Systems Overview: Dŵr Cymru Welsh Water

Dŵr Cymru Welsh Water met 6 of 23 Ofwat performance targets in 2025-26 and was rated off track, even as revenue rose to £1,169.8 million on a c.30% uplift in household bills. Ofwat found the company had not shown it was on track to deliver its 2025-30 commitments: water outputs were 23% below baseline in 2025-26, and although wastewater outputs ran 59% ahead, wastewater deliverable allowances were 66% underspent and fewer than 40% of wastewater schemes are expected with the supply chain by the end of 2026-27.
Geography
Wales
Edition
November 2026, First edition
Length
13 pages
Explore report
Water Utility of the Future: EYDAP S.A. cover

Water Utility of the Future: EYDAP S.A.

EYDAP is becoming a regulated regional system operator: a €2.5 billion investment plan for 2026–2035, an approved 6.24% WACC for 2025–2029 and about 43 water providers to absorb by July 31, 2027. Its delivery pace is the test, with €77.5 million of investment absorbed in 2025 and the tender for about 2.1 million smart meters now targeted for H1 2027.
Geography
Athens and Attica, Greece
Edition
November 2026, First edition
Length
16 pages
Explore report
Water Systems Overview: EYDAP S.A. cover

Water Systems Overview: EYDAP S.A.

Athens' water system splits supply from service: EYDAP Fixed Assets owns the External Water Supply System, while EYDAP treats and distributes water for approximately 4,400,000 residents. Reservoir reserves recovered from 399.7 to 723.9 million m3 in the first half of 2026 but stayed below 2019 levels, and non-revenue water was 25.46% in H1 2026.
Geography
Athens and Attica, Greece
Edition
November 2026, First edition
Length
12 pages
Explore report
EYDAP S.A.: Utility Account Brief cover

EYDAP S.A.: Utility Account Brief

EYDAP has no loan obligations and a €2.5 billion investment plan for 2026–2035, but absorbed €77.5 million in 2025, so its procurement pace is what suppliers should follow. The €94.02 million Rafina-Spata treatment plant re-tender closed for bids on 3 November 2026, and a tender for about 2.1 million smart meters is targeted for H1 2027.
Geography
Athens and Attica, Greece
Edition
November 2026, First edition
Length
10 pages
Explore report
DC Water: Utility Account Brief cover

DC Water: Utility Account Brief

DC Water's FY 2027 capital budget of US$1,072.3 million is 38.0% above the revised FY 2026 budget, inside a US$9.69 billion ten-year plan, and its October 2, 2026 forecast lists 13 planned capital solicitations. The largest new work is a US$120M–US$130M progressive design-build for M Street transmission mains, alongside lead line packages of US$35M–US$40M each and a CMAR master agreement for Potomac Interceptor rehabilitation.
Geography
Washington, District of Columbia, United States; wholesale wastewater for Maryland and Virginia counties
Edition
November 2026, First edition
Length
11 pages
Explore report
Utility Intelligence Profile: DC Water cover

Utility Intelligence Profile: DC Water

DC Water earned US$1,004.3 million in operating revenues in FY 2025, with combined debt service coverage of 2.40x against total debt of US$4,090.1 million. It serves 127,562 accounts in the District and treats wastewater for about 1.8 million people in neighboring jurisdictions at Blue Plains, inside a US$9.69 billion ten-year capital plan.
Geography
Washington, District of Columbia, United States; wholesale wastewater for Maryland and Virginia counties
Edition
November 2026, First edition
Length
12 pages
Explore report
Water Systems Overview: DC Water cover

Water Systems Overview: DC Water

DC Water runs a regional wastewater system serving about 1.8 million suburban users alongside a District-only drinking water network that relies on one river, with the Washington Aqueduct withdrawing about 140 million gallons a day. Its FY 2027 capital budget of US$1,072.3 million is 38.0% above the FY 2026 revised budget, inside a US$9.69 billion ten-year plan.
Geography
Washington, District of Columbia, United States; wholesale wastewater for Maryland and Virginia counties
Edition
November 2026, First edition
Length
12 pages
Explore report
Water Utility of the Future: DC Water cover

Water Utility of the Future: DC Water

DC Water is turning into the operator of a regional system built around storage, resource recovery and a possible second drinking water source, inside a US$9.69 billion capital plan for FY 2026–FY 2035. Its main commitments converge on 2029–2030: the US$819 million Potomac River Tunnel and the Piney Branch Tunnel, while lead service line removal, with more than 12,000 lines replaced by summer 2026, is expected to run beyond its original 2030 target.
Geography
Washington, District of Columbia, United States; wholesale wastewater for Maryland and Virginia counties
Edition
November 2026, First edition
Length
15 pages
Explore report
Water Systems Overview: Southern Water cover

Water Systems Overview: Southern Water

Southern Water's water service is improving while its wastewater performance is not: supply minutes lost per property fell 96% in FY2025-26, yet the Environment Agency rated the company 1 star for 2025, with 301 pollution incidents, 12 of them serious. In Hampshire, a hosepipe ban in force since 10 July 2026 and a River Test drought order awaiting the Secretary of State show supply still relies on emergency measures, while the new sources are still in consenting and construction.
Geography
Kent, Sussex and Hampshire, South East England, United Kingdom
Edition
November 2026, First edition
Length
12 pages
Explore report
Utility Intelligence Profile: Southern Water cover

Utility Intelligence Profile: Southern Water

Southern Water's revenue rose to £1,443.2 million in FY2025-26, the first year of its 2025-30 price control, and the company returned to an operating profit of £304.2 million. Its environmental and customer standing has not followed: the Environment Agency rated it 1 star for 2025, and it ranks 17th of 17 companies for customer satisfaction.
Geography
Kent, Sussex and Hampshire, South East England, United Kingdom
Edition
November 2026, First edition
Length
13 pages
Explore report
Southern Water: Utility Account Brief cover

Southern Water: Utility Account Brief

Most of Southern Water's capital work for 2025-30 is already let: a £3.1 billion Strategic Delivery Partner framework awarded in August 2024 and £466 million of wastewater network contracts announced in April 2025. The main direct openings are in water recycling, where a tender for two plants able to supply up to 33.4 million litres a day in drought closes on 1 April 2027, and in specialist environmental frameworks.
Geography
Kent, Sussex and Hampshire, South East England, United Kingdom
Edition
November 2026, First edition
Length
11 pages
Explore report
PUB, Singapore's National Water Agency: Utility Account Brief cover

PUB, Singapore's National Water Agency: Utility Account Brief

PUB's upcoming-tender list of 10 November 2026 carries 29 entries above S$90,000, led by the Tuas Water Reclamation Plant's digital infrastructure package (ME02, grade L6) due in December 2026. Tuas WRP construction progress was 65% as at 31 May 2026, and the next large NEWater plant is already let: Changi NEWater Facility 3 went to Sanli M&E Engineering for S$205 million.
Geography
Singapore (national service area)
Edition
November 2026
Length
13 pages
Explore report
Water Security and Supply Outlook in Abu Dhabi cover

Water Security and Supply Outlook in Abu Dhabi

Abu Dhabi's desalinated supply met a 2023 peak of 3.59 million m³ a day with transmission interruptions costing only 0.0078% of supply, but the regulator gives installed capacity as both 4.74 and 4.14 million m³ a day, so the margin is about 32% or about 15%. More than 2 million m³ a day of contracted capacity reaches expiry by 2037, and after Mirfa 2 and Shuweihat 4 the next RO plant is uncertain, with Saadiyat at letter of award: cancellation was reported in late 2025, but MEED still described it as being developed by Acciona in April 2026.
Geography
United Arab Emirates
Edition
November 2026, First edition
Length
11 pages
Explore report
Water Infrastructure Investment and Project Pipeline in Abu Dhabi cover

Water Infrastructure Investment and Project Pipeline in Abu Dhabi

Abu Dhabi's water network and wastewater projects are moving through award and procurement, with a US$163 million STEP pumping-station rehabilitation, a 1 million m³ emergency lagoon and the US$775 million Mirfa–Liwa scheme due for bids on 5 January 2027, while the next desalination purchase agreement is unclear: Saadiyat has a letter of award to Acciona but a contested status, with 2025 reports of possible cancellation and MEED still naming Acciona as developer in April 2026. Network investment under RC2 was projected at AED 16.2 billion against about AED 21.3 billion forecast by the companies, and the successor control from 1 January 2027 had not been issued as of 11 November 2026.
Geography
United Arab Emirates
Edition
November 2026, First edition
Length
12 pages
Explore report
Climate Resilience: Drought and Flood Risk in Abu Dhabi cover

Climate Resilience: Drought and Flood Risk in Abu Dhabi

Abu Dhabi's climate risk to water lies in flood, coast and groundwater rather than rainfall drought: potable supply is desalinated and a 2010 study found climate change adds only about 3% to 2050 demand. More than 80 million m³ of rainwater had to be managed in a single week after the late-March 2026 storm, and in May 2026 the government allocated AED 11 billion to five PPP projects for dams, water storage, flood control and stormwater, while the projections cited for heat and sea level date from 2010.
Geography
United Arab Emirates
Edition
November 2026, First edition
Length
9 pages
Explore report