454 reports

Showing 49–72
Water Infrastructure Investment and Project Pipeline in Kuwait cover

Water Infrastructure Investment and Project Pipeline in Kuwait

An assessment of which water projects Kuwait is building and buying, who owns and funds them, what stage and value each has reached and where contractors, suppliers and investors can enter. Kuwait's 2026 water investment runs at two speeds: about KD 1.19bn of ministry contracts were signed in 2026, led by the KD 998m to 999.85m North Kabd wastewater plant, while about 180 MIGD of new desalination is under signed contracts and a further 200 MIGD sits in bid evaluation or planning.
Geography
Kuwait
Edition
November 2026, First edition
Length
15 pages
Explore report
Kuwait Country Intelligence Profile cover

Kuwait Country Intelligence Profile

A reference assessment of how Kuwait gets, runs, prices and expands its water: who is responsible, where supply comes from, the key national figures and which projects are changing the system. Kuwait withdraws 3,850.50% of its renewable freshwater and relies on 683.3 MIGD of desalination capacity run by one ministry. Its 2026 build is led by wastewater, with North Kabd under construction at KD 998m to 999.85m, while the 546,000 m3/d Az-Zour North 2 & 3 expansion has not reported financial close.
Geography
Kuwait
Edition
November 2026, First edition
Length
14 pages
Explore report
Water Utility of the Future: EYATH S.A. cover

Water Utility of the Future: EYATH S.A.

An assessment of how EYATH is turning from Thessaloniki's water and sewerage company into a regional system operator, and what its plans, regulation and funding allow it to deliver by 2030. EYATH has a regulator-approved €221.6 million investment plan for 2025-2029 and a legal deadline of July 31, 2027 to take over water supply, sewerage and irrigation across the Thessaloniki and Chalkidiki regional units. Delivering it means raising investment from €14.3 million completed in 2024 to about €44.3 million a year, with tariffs fixed to 2029 and a proposed EIB loan of about €150 million still under appraisal.
Geography
Thessaloniki, Greece
Edition
November 2026 edition
Length
17 pages
Explore report
Water Systems Overview: EYATH S.A. cover

Water Systems Overview: EYATH S.A.

An overview of whether Thessaloniki's water system, from its river, springs and boreholes to its plants, networks and governing institutions, can absorb the expansion that EYATH takes on by July 2027. Thessaloniki's main source reaches the city through one treatment plant that averaged 93.2% of its first-phase capacity in 2025, while its second phase has slipped to 2027. The system is run by a debt-free, state-controlled company whose tariffs are now fixed to 2029 under a €221.6 million approved investment plan, and which must take over two regional units by July 31, 2027.
Geography
Thessaloniki, Greece
Edition
November 2026 edition
Length
12 pages
Explore report
EYATH S.A.: Utility Account Brief cover

EYATH S.A.: Utility Account Brief

A guide for suppliers to where EYATH spends, how it buys, who holds its major contracts and which Thessaloniki water and wastewater projects are open, confirmed or emerging. EYATH's regulator-approved €221.6 million plan for 2025-2029 averages €44.3 million a year, against €14.3 million of investment completed in 2024. In November 2026 it has open tenders for OT/SCADA telecommunications, server hardware and meter services, and it is preparing a new operation, maintenance and upgrade contract for its water treatment plant.
Geography
Thessaloniki, Greece
Edition
November 2026 edition
Length
11 pages
Explore report
Water Systems Overview: Seattle Public Utilities cover

Water Systems Overview: Seattle Public Utilities

An assessment of whether Seattle Public Utilities' watersheds, treatment, network, institutions and finances can carry a larger capital program of seismic, storage, dam and overflow obligations through the 2030s. Seattle Public Utilities has supply to spare: water produced in 2025 averaged 126.7 MGD against a 172 MGD firm yield, and leakage fell to 4.5%. The pressure is capital: the Mayor's proposed 2027–2032 water program is about US$1,067 million, rates rise 4.3% a year from 2027, and the 2026 Official Statement expects US$553.2 million of new parity bonds over 2027–2031.
Geography
Seattle, Washington, United States
Edition
November 2026, First edition
Length
13 pages
Explore report
Seattle Public Utilities: Utility Account Brief cover

Seattle Public Utilities: Utility Account Brief

An assessment of where Seattle Public Utilities will spend on water and drainage over 2027–2032, how its contracts are bought, and which suppliers are best placed to win them. Seattle Public Utilities' own May 2026 contract list names on-call consultant pools of US$20 million and US$30 million and a US$200 million Lower Duwamish construction contract. Behind them sit a proposed 2027–2032 Water CIP of about US$1,067 million and a Drainage and Wastewater CIP of US$2,344.3 million, neither adopted by November 16, 2026.
Geography
Seattle, Washington, United States
Edition
November 2026, First edition
Length
11 pages
Explore report
De Watergroep: Utility Account Brief cover

De Watergroep: Utility Account Brief

A supplier's guide to where De Watergroep spends, how it buys under EU utilities rules and through Waterunie Operator, who holds major work, and which programmes to pursue first. De Watergroep spent €162.165 million on mains in 2025, up from €141.475 million, with a €350 million European Investment Bank loan fully signed for its 2023–2028 programme. A joint meter framework estimated at €198,619,000 closed for bids on 7 April 2026, and from 2026 Waterunie Operator runs operations for De Watergroep and Farys.
Geography
West Flanders, East Flanders, Flemish Brabant and Limburg, Flanders, Belgium
Edition
November 2026, First edition
Length
11 pages
Explore report
Utility Intelligence Profile: De Watergroep cover

Utility Intelligence Profile: De Watergroep

A reference profile of what De Watergroep runs, how it is paid, regulated and financed, what it is building, and which milestones to follow toward the full merger with Farys intended by 2032. De Watergroep returned to a €24.1 million profit in 2025 after three loss years, while turnover reached €974.0 million in the first year of a tariff plan that raised tariffs 11.6%. Net debt to EBITDA fell to 5.9 against a limit of 9, but its leakage index of 1.15 remains behind a 2025 target of 1.07.
Geography
West Flanders, East Flanders, Flemish Brabant and Limburg, Flanders, Belgium
Edition
November 2026, First edition
Length
12 pages
Explore report
Water Systems Overview: De Watergroep cover

Water Systems Overview: De Watergroep

An assessment of whether De Watergroep's sources, network, institutions and finances can deliver a climate-robust drinking water system across four Flemish provinces through 2030 and the planned 2032 asset merger with Farys. De Watergroep's water meets standard in about 99.8% of analyses, but its Infrastructure Leakage Index has fallen by only 0.08 since 2022, to 1.15 in 2025, against a target of 0.80 by end-2030. Net purchases over sales equal about 28% of the 174,012,068 m³ it made available in 2025, while key sources such as Kluizen and De Gavers are still being rebuilt.
Geography
West Flanders, East Flanders, Flemish Brabant and Limburg, Flanders, Belgium
Edition
November 2026, First edition
Length
12 pages
Explore report
Water Infrastructure Investment and Project Pipeline in Muscat cover

Water Infrastructure Investment and Project Pipeline in Muscat

An assessment of what is being built and financed for Muscat's water, wastewater and flood protection, by whom, at what stage and value, and which contracts open to bidders by 2027. Muscat's water projects are moving fastest where private capital carries the risk: Ghubrah III, backed by a US$370 million project finance package, was 93% built in November 2026, and bids for the Al Ansab and Al Amerat sewage plant PPP are due on 5 January 2027. Network works of about RO 188 million in Al Seeb and Bawshar rest on Nama Water Services, whose 2024 operating revenue was 40.5% government subsidy, while its RO 11.1 billion master plan puts RO 7.2 billion into wastewater.
Geography
Oman
Edition
November 2026, First edition
Length
14 pages
Explore report
Climate Resilience: Drought and Flood Risk in Jeddah cover

Climate Resilience: Drought and Flood Risk in Jeddah

An assessment of how exposed the water system in Jeddah is to drought and flooding, and how far current programmes, policy and investment reduce that risk. The climate risk documented for Jeddah's water is flooding: 179 mm fell on 24 November 2022, more than the 86.4 mm recorded at Jeddah-KAIA in all of 2018. The city's stormwater programme covered 46% of the city at end-2024 against a 75% target for 2028. Its largest scheme, the KAFA tunnel at about USD 175 million per phase, had no signed agreement as of August 2026.
Geography
Saudi Arabia
Edition
November 2026, First edition
Length
10 pages
Explore report
Water Security and Supply Outlook in Jeddah cover

Water Security and Supply Outlook in Jeddah

An assessment of whether water supply in Jeddah can keep pace with demand, and which sources, projects and policies will decide that. The desalination system that supplies Jeddah has grown since 2024: Shuaiba-5 now produces 665,000 m³/day against a 600,000 m³/day design, Shuaibah 3 Conversion has operated since May 2025 and Rabigh 4 is reported online. These are regional capacities serving Jeddah, Makkah and other towns of the Makkah Region. The city's latest indicators are leakage above 20% (2017) and an academic projection of demand rising from 335 MCM in 2017 to 779 MCM in 2030.
Geography
Saudi Arabia
Edition
November 2026, First edition
Length
11 pages
Explore report
Water Infrastructure Investment and Project Pipeline in Jeddah cover

Water Infrastructure Investment and Project Pipeline in Jeddah

A guide to water infrastructure investment in Jeddah: the programmes and projects planned or under way, who is responsible, the risks to delivery and what to watch. Most of Jeddah's water work still being contracted is in sewers and storm drains: NWC's two 2025 packages carry over SAR 2.3 billion (wastewater) and over SAR 1.8 billion (water) of announced cost, and SR 536.3 million of north Jeddah sewer contracts were awarded in February 2026. The municipality's KAFA tunnel, at about USD 175 million per phase, still had no signed agreement in August 2026, while Prince Fawaz drainage bids close on 15 November 2026.
Geography
Saudi Arabia
Edition
November 2026, First edition
Length
13 pages
Explore report
Jeddah City Intelligence Profile cover

Jeddah City Intelligence Profile

A reference profile of the water system in Jeddah: its sources and supply, the institutions that run it, major projects, tariffs and finance, climate risk and what to watch next. Jeddah's bulk supply has grown at regional scale, with Shuaiba-5 raised to 665,000 m³/day and Shuaibah 3 Conversion operating since May 2025; these plants serve the wider Makkah Region. The city's own weak points are local: leakage above 20% (2017) and stormwater projects covering 46% of the city at end-2024. The capital now moving is local too: NWC packages of over SAR 2.3 billion (wastewater) and over SAR 1.8 billion (water), and municipal drainage contracts.
Geography
Saudi Arabia
Edition
November 2026, First edition
Length
13 pages
Explore report
Water Infrastructure Investment and Project Pipeline in Doha cover

Water Infrastructure Investment and Project Pipeline in Doha

A guide to water infrastructure investment in Doha: the programmes and projects planned or under way, who is responsible, the risks to delivery and what to watch. Doha's water investment runs on two tracks: Facility E, a QAR 13.5bn power and desalination plant financed with a USD 2.97bn co-financing package and due to deliver full water on 1 August 2028, and a flow of Ashghal drainage work led by eight projects worth about QAR 7bn scheduled for tender since February 2026. Delivery risk is visible, with eight delayed Ashghal packages re-awarded to new contractors in October 2026.
Geography
Qatar
Edition
November 2026, First edition
Length
13 pages
Explore report
Doha City Intelligence Profile cover

Doha City Intelligence Profile

A reference profile of the water system in Doha: its sources and supply, the institutions that run it, major projects, tariffs and finance, climate risk and what to watch next. Doha has no separate water system: its water comes through KAHRAMAA's single national network from desalination plants with 538 MIGD of capacity in 2024, against national demand of 420 MIGD. Capacity is expected to reach 648 MIGD after the Facility E plant is commissioned in 2028, while Ashghal's sewer, treated-effluent and flood-drainage works make up seven of the eleven projects listed.
Geography
Qatar
Edition
November 2026, First edition
Length
13 pages
Explore report
Water Infrastructure Investment and Project Pipeline in Qatar cover

Water Infrastructure Investment and Project Pipeline in Qatar

A guide to water infrastructure investment in Qatar: the programmes and projects planned or under way, who is responsible, the risks to delivery and what to watch. Qatar's QAR 13.5 billion Facility E desalination and power plant is under construction on sponsor funds, because its senior-debt financial close was still delayed in October 2026. KAHRAMAA's QAR 4.1 billion water plan, its QAR 21.4 billion 2026 procurement plan and Ashghal's QR81 billion programme cannot be added together or reconciled.
Geography
Qatar
Edition
November 2026, second edition
Length
14 pages
Explore report
Water Systems Overview: Philadelphia Water Department cover

Water Systems Overview: Philadelphia Water Department

An assessment of whether Philadelphia's two-river supply, three treatment plants, aging pipe networks and City-owned institutions can meet a regulatory calendar running to 2036. Philadelphia's plants have ample room: average distribution of 228.9 MGD in FY 2024 used about 42% of 546 MGD rated treatment capacity. The pressure sits in the networks, where non-revenue water rose to 103.2 MGD in FY 2023 from 92.4 mgd (41.7%) in the FY 2019 audited balance, and in a capital program stated as US$4,731.85 million by PWD and about US$6.4 billion by Moody's.
Geography
Philadelphia, Pennsylvania, United States
Edition
November 2026, First edition
Length
13 pages
Explore report
Philadelphia Water Department: Utility Account Brief cover

Philadelphia Water Department: Utility Account Brief

An assessment of where Philadelphia Water Department will spend on its capital program, how it buys, who already holds its major contracts and which projects suppliers should pursue first. PWD's proposed capital program for FY 2026 to FY 2031 totals US$4,731.85 million, against about US$6.4 billion reported by Moody's, with replacement and rehabilitation at 80%. The City's Fall 2026 forecast already names PWD plant contracts for 2027, including the Lardner's Point pumping station and a sixth sedimentation tank, each estimated at more than US$10m.
Geography
Philadelphia, Pennsylvania, United States
Edition
November 2026, First edition
Length
11 pages
Explore report
Vitens: Utility Account Brief cover

Vitens: Utility Account Brief

A supplier's guide to Vitens: how it is organised and makes decisions, its financial position and priorities, how it buys, and the opportunities to target first. Vitens's net investment reached €341.5 million in 2025, up 93% since 2021, and its 2026 tenders include a €7.2 million pump framework and cleaning for about 350 technical sites. Its own 2025 annual report warns of insufficient investment room and plans to phase the investment programme, while objection procedures slow the new source capacity it needs.
Geography
Netherlands
Edition
November 2026, First edition
Length
12 pages
Explore report
Water Utility of the Future: San Francisco Public Utilities Commission cover

Water Utility of the Future: San Francisco Public Utilities Commission

An assessment of how far the San Francisco Public Utilities Commission is moving from service provider to system operator, across digital control, energy and carbon, climate-ready infrastructure, customers, governance and capital planning. SFPUC's US$12,559.0 million capital plan for FY2026-27 to FY2035-36 moves its growth to public power, lifting Hetch Hetchy Power capital 81.6% to US$2,242.7 million while the Water plan falls 15.4%. Its largest single commitment is US$1,470.3 million for Bay nutrient removal, forecast for November 2039, all paced by an Affordability Policy under which US$15.9 billion of proposals were cut back.
Geography
San Francisco, California, United States; regional wholesale supply in Alameda, Santa Clara and San Mateo counties
Edition
November 2026, First edition
Length
15 pages
Explore report
Water Systems Overview: San Francisco Public Utilities Commission cover

Water Systems Overview: San Francisco Public Utilities Commission

An overview of the water system served by the San Francisco Public Utilities Commission: its water resources, governance and institutions, infrastructure and service delivery, and its strategic outlook. SFPUC's regional water system depends on Hetch Hetchy Reservoir for up to 85% of deliveries to about 2.7 million people, while storage expansion and purified water supply have been canceled or deferred. In FY2025 it renewed 9.1 miles of water main against a 15-mile target, and its adopted US$12,559.0 million capital plan puts US$5,916.1 million into wastewater.
Geography
San Francisco, California, United States; regional wholesale supply in Alameda, Santa Clara and San Mateo counties
Edition
November 2026, First edition
Length
11 pages
Explore report
Utility Intelligence Profile: San Francisco Public Utilities Commission cover

Utility Intelligence Profile: San Francisco Public Utilities Commission

A reference profile of the San Francisco Public Utilities Commission: its service mandate, water supply, treatment and networks, wastewater, finances, major projects, tariffs, governance and climate resilience. SFPUC's Water Enterprise earned US$678.6 million of operating revenue in FY2025 with indenture coverage of 2.17, while department-wide debt principal reached US$11,443.7 million. Its adopted US$12,559.0 million capital plan is about 70% debt-funded, and sewer rates rose 15.0% in July 2026 with a further 14.5% adopted for July 2027.
Geography
San Francisco, California, United States; regional wholesale supply in Alameda, Santa Clara and San Mateo counties
Edition
November 2026, First edition
Length
12 pages
Explore report